The Run-Off Report
Dashboard
Inspection List
New Inspection
Org Admin
Admin
Account
Sign Out
Editing:
You are updating an existing inspection.
Create Inspection
Complete the project details and checklist. Each item accepts up to
4 photos
.
General Site Information
Project Name
Inspector Name
Location (Address)
Tip: enter an address, then click NOAA to auto-fill weather.
Date of Inspection
Time of Inspection
Inspection Type
Weekly
Monthly
Pre-Storm
During Storm
Post Storm
Quarterly Visual Observations
Contained Stormwater Release
QSD Initial
QSD Bi-Annual
QSD NAL Exceedance
QSD NOT
Project Level / Type
WDID #
Approximate area of site exposed
Stage of Construction
Grading & Land Development
Vertical Construction
Demolition
Final Stabilization
Inactive Construction Site
Is there any reason a visual inspection cannot be performed at this time?
Current Conditions (Weather)
Fill Weather from NOAA
Typed Signature (renders in cursive)
Script
Smooth
Formal
Clear
General
▾
Is the project SWPPP and BMP plan up to date, available on-site, and being properly implemented?
Yes
No
N/A
Comments
📷 Drag & drop up to
4 photos
, or click to select
Good Housekeeping – Construction Materials
▾
Are all stockpiled materials covered and bermed if not being actively used?
Yes
No
N/A
Comments
📷 Drag & drop up to
4 photos
, or click to select
Are all construction materials properly stored and inventoried?
Yes
No
N/A
Comments
📷 Drag & drop up to
4 photos
, or click to select
Good Housekeeping – Waste Management
▾
Are portable toilets and rinse stations sited properly and equipped with secondary containment?
Yes
No
N/A
Comments
📷 Drag & drop up to
4 photos
, or click to select
Are trash bins and waste containers covered at the end of each day or prior to rain?
Yes
No
N/A
Comments
📷 Drag & drop up to
4 photos
, or click to select
Vehicle Storage & Maintenance
▾
Are all construction vehicles stored, fueled, and washed properly per permit?
Yes
No
N/A
Comments
📷 Drag & drop up to
4 photos
, or click to select
Measures in place to prevent oil/grease/fuel leaks?
Yes
No
N/A
Comments
📷 Drag & drop up to
4 photos
, or click to select
Non-Stormwater Management
▾
Are non-stormwater discharges properly controlled and monitored?
Yes
No
N/A
Comments
📷 Drag & drop up to
4 photos
, or click to select
Erosion Control
▾
Are wind erosion controls effectively implemented?
Yes
No
N/A
Comments
📷 Drag & drop up to
4 photos
, or click to select
Are inactive areas protected with erosion controls?
Yes
No
N/A
Comments
📷 Drag & drop up to
4 photos
, or click to select
Sediment Control
▾
Are perimeter controls effective in preventing discharges?
Yes
No
N/A
Comments
📷 Drag & drop up to
4 photos
, or click to select
Are storm drain inlets protected and maintained?
Yes
No
N/A
Comments
📷 Drag & drop up to
4 photos
, or click to select
Run-On / Run-Off
▾
Is run-on effectively managed away from disturbed areas?
Yes
No
N/A
Comments
📷 Drag & drop up to
4 photos
, or click to select
Are dewatering activities compliant with discharge parameters?
Yes
No
N/A
Comments
📷 Drag & drop up to
4 photos
, or click to select
Cancel
Save Inspection